CPP system of M/V ATLANTIC MONACO was repaired successfully in our workshop at Keratea during her dry docking works at Syros island.
The hub was machined inside out for wear removal and mating surfaces smoothening while the blade carriers (4 units) and the sliding shoes (4 units) were built up by Laser Cladding and machined to desired dimensions and tolerances.
The repair work was completed in 6 days.